Drilling operations in Platform C are over and drilling rigs are operating on Platforms A and D of this phase.
Fifteen more wells are still to be drilled in this phase of the offshore field which Iran shares with neighboring Qatar.
Phase 19 and Phase 1 of South Pars are located close to each other.
The refinery of Phase 19 receives 57 mcm/d of combined sour gas, gas condensate, water and other substances.
Phase 19 was awarded by Pars Oil and Gas Company in June 2020 to a consortium of Petropars Limited, Petropars Iran and Iranian Offshore Engineering and Construction Company (IOEC) under an engineering, procurement and construction (EPC) contract.
Your Comment