Keramat Behbahani said 54 wells have so far been drilled and the remaining four will have been drilled by the end of the Iranian calendar year.
He said so far 48 production, two appraisal, one key, two waste disposal and one enhanced recovery wells have been drilled in the oil field shared by Iran and Iraq.
Behbahani said 3D seismic operations, environment studies, demining, spatial planning and road construction are over.
North Azadegan oil field is expected to contribute 75,000 b/d to Iran’s oil production.
Your Comment