Rasould Fallahnejad said the fifth consignment, loaded by single-point mooring, weighs 1.2 million barrels.
He said that so far more than 5.7 million barrels of condensate has been exported from Phase 12 of South Pars.
Phase 12, which is the main phase in South Pars, is expected to feed 3 bcf/d of sour gas (equivalent to 65 mcm/d of sweet gas) into national trunklines when it becomes fully operational.
Your Comment